Concept visualisation — a finished brick home behind a sandstone wall at twilight

Sydney — Town Planning for Residential Projects

Town Planning

Understand what the property can support, identify the approval pathway, and build the planning case to move forward.

The approach

The right approval pathway depends on the property, not the proposal.

Zoning, planning controls and site constraints decide what can be approved and how. We read the property first, then build the planning case that fits it.

Site reading

Existing and potential

Illustrative concept — the same property with a secondary dwelling and landscaping in the rear yard

Illustrative concept

Capabilities

01

Planning advice and feasibility

Before anything is drawn or lodged: what the controls allow, what the site constrains, and whether the proposal holds up.

Concept visualisation — an aerial of a suburban block with its site boundaries legible

Concept visualisation

02

Preliminary Planning Assessment

A structured review of your property's zoning, controls, constraints and approval pathways — before you spend on design.

Start with a Planning Assessment
Concept visualisation — a dwelling responding to its site's slope and setbacks

Concept visualisation

03

DA and CDC pathway advice

Two ways to approval, with different rules, timeframes and risks. We identify which one fits your property and proposal.

Concept visualisation — a paired dual-occupancy home

Concept visualisation

04

Planning reports

The written planning case that supports your application, prepared to address the controls that apply to your site.

Statement of Environmental Effects — the written planning case prepared to support a development application
Planning report

05

Council correspondence and application support

Requests for information, clarifications and responses, handled in the language council uses.

Concept visualisation — an established residential street at dusk

Concept visualisation

06

Unapproved works and compliance

Already built something without approval? In many cases it can be documented and approved retrospectively. We assess what exists, identify what applies, and prepare the pathway to compliance.

Approved site plan extract — existing works set out on the drawing for approval
Approved documentation

Statement of Environmental Effects
from $800
Waste Management Plan
from $500
Plan of Management
from $600
Heritage Impact Statement
from $2,000

Sheet RP-01

Post-consent documentation is prepared under the same engagement: Construction Certificate, Occupation Certificate and NSW Planning Portal lodgement.

Every fee is confirmed in writing before any work begins.

One practice, two disciplines

Explore architectural drafting

DA or CDC

Two pathways to approval.

DA
A Development Application is assessed by your local council on the merits of the proposal against its planning controls. It is the pathway for proposals that need judgement: variations, constrained sites, or anything outside pre-set standards.
CDC
Complying Development is a faster, certified pathway for proposals that meet every pre-set standard, checked and approved by a certifier rather than assessed by council.

Which one applies is a property question, not a preference. That is what we establish first.

Concept visualisation — a courtyard elevation with brick screening and established planting

Selected work

Greenwell

DA approved · Swimming pool

A new residential pool on a constrained site: construction access limited by a significant tree at the front of the property and arranged through a neighbouring block, with the layout resolved around an existing sewer line and the relevant authority requirements.

Greenwell — Excavation under way on a constrained suburban block
Greenwell — The excavation alongside the existing dwelling
Greenwell — The pool shell arriving on a truck
Greenwell — The shell craned over the boundary into position
Greenwell — The shell being set into the excavation
Greenwell — The shell seated, with earthworks around it
Greenwell — Pool services and pipework
Greenwell — The completed pool filled
Greenwell — The pool with the rear of the dwelling behind
Greenwell — Glass pool fencing installed to the pool surround
Greenwell — The pool and timber deck
Greenwell — The pool, fencing and dwelling
Greenwell — A wide view of the completed pool and surround
Greenwell — The pool surround and glazing
Greenwell — The pool leading to the covered verandah
Greenwell — The dwelling and pool from the rear yard
Greenwell — The pool, deck and dwelling
Greenwell — The completed pool in daylight
Greenwell — The pool at dusk
Greenwell — The pool and fencing at dusk
Greenwell — The pool at dusk with the dwelling lit behind

Completed work · 21 frames

Common questions

  • Do I need a DA, or can I use CDC?

    It depends on your property's zoning and whether the proposal meets complying development standards. A Planning Assessment establishes which pathway applies before you commit to design.

  • I've already built something without approval. Can it be fixed?

    Often, yes. Existing works can frequently be documented and approved retrospectively. We review what has been built and prepare the documentation to bring it into compliance.

  • How long does approval take?

    It varies with the pathway and the council. Once we have reviewed your property we set out the realistic sequence and timeframes for your specific case rather than quoting a generic number.

  • What does it cost?

    Scope depends on the property and the pathway. We define the work and the fee after the initial review, so you are never paying for documentation you do not need.

Where to start

Not sure which pathway fits your property?

Start with a Planning Assessment. We establish what the property can support and what to do next — before you pay for plans.

Concept visualisation.